ECOSI supports industrial teams through FAT, SAT, commissioning, installation verification, and technical assurance. We help validate equipment, documentation, control systems, and startup conditions to reduce commissioning risk and support safe, reliable operations from factory acceptance through site handover.

We review critical equipment and vendor packages against specs, codes and safety requirements. This includes technical assessment of compressors, reactors, furnaces and API pumps, participation in HAZOP/LOPA/DRI, supervision of FAT, and a structured audit of vendor dossiers (certificates, curves, manuals).

On site, we verify electro-mechanical installation against IFC and capture all “as-built” changes. We monitor loop checks, SAT, dry runs and initial start-ups under real operating conditions, validating control loops and SIS configurations and documenting any deviations.

We capture real operating parameters, fine-tune controllers, and consolidate all commissioning data in structured reports and parameter dossiers. We prepare initial operating procedures and maintenance routines and manage the formal technical handover to the O&M team.
We connect FAT, SAT and commissioning in one methodology, so issues found at the factory are traced and closed on site.
Standardized checklists and templates ensure 100% of required documents are complete, verified and audit-ready.
By validating equipment, documentation and configuration before and during commissioning, we avoid late-phase errors that typically cause costly schedule slips.
Commissioning results and real parameters are structured so they feed directly into technical databases, O&M procedures and maintenance plans.
The methodology is designed for large refining and industrial projects with high temperature/pressure and H₂S, where technical assurance is critical.